Vol. 11 No. 2 (2013): Fuentes, el reventón energético
Articles

Development of a software tool for risk assessment and analysis based on api 580 and 581

Andy Quintero Castillo
Universidad Industrial de Santander
Bio
Jorge Acevedo Pérez
Universidad Industrial de Santander
Bio
Iván Uribe Pérez
Grupo de Investigación en Corrosión, Universidad Industrial de Santander
Bio
Luis Aguirre Rodriguez
Grupo de Investigación en Corrosión, Universidad Industrial de Santander
Bio

Published 2013-12-23

Keywords

  • RBI,
  • Inspection,
  • Probability,
  • Consequence

How to Cite

Quintero Castillo, A., Acevedo Pérez, J., Uribe Pérez, I., & Aguirre Rodriguez, L. (2013). Development of a software tool for risk assessment and analysis based on api 580 and 581. Fuentes, El reventón energético, 11(2). Retrieved from https://revistas.uis.edu.co/index.php/revistafuentes/article/view/3833

Abstract

The aim of this paper is to present the development of a standards-based software aPi- RP-580/581, which is running a series of calculations in order to provide greater reliability to Management Structural Integrity of Campo Escuela, which is currently under responsibility of  the Metallurgical Engineering School of Industrial University of Santander, so that the risk of failure associated with the operation of the equipment, be  administered systemically with  a methodology based on quantitative risk values  , and would minimize one of the higher costs with which  development of the  project faces. 

Downloads

Download data is not yet available.

References

1. API, API RP 580 - Recommended Practice for Risk-Based Inspection, American Petroleum Institute, Washington, D.C.

2. API, API 579-1/ASME FFS-1 2007 Fitness-For-Service, American Petroleum Institute, Washington, D.C., Jun. 2007.

3. API RP 581 Part 1- Inspection Planning Using API RBI Technology, American Petroleum Institute, Washington, D.C, 20005, Sept. 2008.

4. API RP 581 Part 2- Determination of Probability of Failure in an API RBI Assessment, American Petroleum Institute, Washington, D.C, 20005, 20005, Sept. 2008.

5. API RP 581 Part 3- Consequence Analysis in an API RBI Assessment, American Petroleum Institute, Washington, D.C, 20005, Sept. 2008.

6. API RP 571 – Damage Mechanisms in the Refinery and Petrochemical Industry, American Petroleum Institute, Washington, DC, 20005