Obsolescence management of IT assets in the electric power industry
Published 2020-10-22
Keywords
- obsolescence risk assessment,
- asset management,
- obsolescence,
- remaining useful life,
- software
- hardware,
- decision making,
- risk mitigation,
- impact,
- prioritization ...More
How to Cite
Copyright (c) 2020 Revista UIS Ingenierías
This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
Abstract
Given the differences between physical assets and IT assets (also called digital assets), a methodology for managing digital assets obsolescence is proposed, which seeks to support decision making based on the risk of obsolescence. The aim is to identify the likelihood and impact of obsolescence on each asset in order to determine actions to be taken. As a case study, some steps of the methodology were implemented in four digital assets used in the Colombian electric power industry. The methodology can be used and adapted by any company to manage its IT assets, whether hardware of software.
Downloads
References
[2] Deloitte/Canadian Electricity Association, “Asset Health Indices: A Utility Industry Necessity”, 2014 [En línea]. Disponible en: http://www.pubmanitoba.ca/v1/exhibits/mh_gra_2015/coalition-10-3.pdf.
[3] J. Ford, “Document 19 Asset Category – RTU – SCADA EPN. Asset Stewardship Report 2014”, United Kingdom, 2014 [En línea]. Disponible en: https://library.ukpowernetworks.co.uk/library/en/RIIO/Asset_Management_Documents/Volume_Justification/EPN/UKPN_EPN_Asset_Plan_SCADA_RTUs.pdf.
[4] D. Jeyakumar y T. Mazeika, “Document 13 Asset Category – Protection and Control (Capex and Opex) LPN. Asset Stewardship Report 2014”, United Kingdom, 2014 [En línea]. Disponible en: https://library.ukpowernetworks.co.uk/library/en/RIIO/Asset_Management_Documents/Volume_Justification/LPN/UKPN_LPN_Asset_Plan_Protection_Control.pdf.
[5] S. L. Barreca, “Technology Life-Cycles And Technological Obsolescence”, BRCI Inc., pp. 1-16, 1998.
[6] F. J. Romero Rojo, R. Roy, S. Kelly, “Obsolescence risk assessment process best practice”, J. Phys. Conf. Ser., vol. 364, no. 1, 2012, doi: 10.1088/1742-6596/364/1/012095
[7] International Association of Oil & Gas Producers, “Obsolescence and life cycle management for automation systems - Recommended practice”, 2016 [En línea]. Disponible en: https://www.iogp.org/bookstore/product/obsolescence-and-life-cycle-management-for-automation-systems-recommended-practice/
[8] S. Kelly, D. Williams, “Joint Operator Obsolescence Management Specification” , Recommended Practice for Obsolescence Management, pp. 1-82, 2015.
[9] C. Yang, “Obsolescence management and evaluation of SSCS in nuclear power plants”, en IET Conf. Publ., 2012, doi: 10.1049/cp.2012.2313
[10] X. Meng, B. Thörnberg, y L. Olsson, “Strategic Proactive Obsolescence Management Model”, en IEEE Trans. Components, Packag. Manuf. Technol., vol. 4, no. 6, pp. 1099-1108, 2014, doi: 10.1109/TCPMT.2014.2316212
[11] International Electrotechnical Commission, "Obsolescence management.” Geneva, Switzerland. IEC 62402 Ed. 2.0, 2019.
[12] EAU lines, “Remaining Life Management of Existing AC Underground Lines”, GT B1.09, 2008.
[13] E. Schmid, G. Kosugi, J. Ibsen, M. Griffith, “Don’t get taken by surprise: planning for software obsolescence management at the ALMA Observatory”, Softw. Cyberinfrastructure Astron. IV, vol. 9913, pp. 99131A, 2016, doi: 10.1117/12.2231189
[14] Expert Group 21, “Expert Group 21 : Obsolescence Management Final Report”, EDSTAR, 2016.
[15] T. F. Bowlds, J. M. Fossaceca, R. Iammartino, “Software obsolescence risk assessment approach using multicriteria decision-making”, Syst. Eng., vol. 21, no. 5, pp. 455-465, 2018, doi: 10.1002/sys.21446
[16] PIARC, “IDENTIFYING CRITICAL ASSETS,” Asset Management Manual - A guide for practitioners! [En línea]. Disponible en: https://road-asset.piarc.org/en/data-and-modeling-risk/identifying-critical-assets
[17] Powerco, “Electricity Asset Management Plan 2019”, New Zeland, 2019. [En línea]. Disponible en: https://www.powerco.co.nz/media/2064/2019-electricity-amp-powerco-vf.pdf.
[18] CREG (Comisión de regulación de energía y gas), “Metodología para la remuneración de la actividad de distribución de energía electrica en el Sistema Interconectado Nacional”, Resolución 015, pp. 239, 2018, [En línea]. Disponible en: http://apolo.creg.gov.co/Publicac.nsf/1c09d18d2d5ffb5b05256eee00709c02/65f1aaf1d57726a90525822900064dac?OpenDocument.