Vol. 3 No. 2 (2004): Revista UIS Ingenierías
Articles

Establishment of the operational reserve as a complementary service

Jairo Fabián Jaimes-Rojas
Acueducto de Bucaramanga
Bio
Gerardo Latorre-Bayona
Universidad Industrial de Santander
Bio

Published 2011-12-01

Keywords

  • Ancillary services,
  • energyrnarkets,
  • index ofreliability,
  • operatingreserve,
  • spinningandnon-spinning reserve

How to Cite

Jaimes-Rojas, J. F., & Latorre-Bayona, G. (2011). Establishment of the operational reserve as a complementary service. Revista UIS Ingenierías, 3(2), 117–126. Retrieved from https://revistas.uis.edu.co/index.php/revistauisingenierias/article/view/2255

Abstract

Interconnected power systems need reliability services (ancillary services) in arder fa guaranteethe viability ofthe energy market. ¡nto the ancillary services directed to improve the system'squality and reliability, isfound the OPERATING RESERVE.There is no! exists a criteria for the evaluation o[this service and ils subsequent remuneration,therefore arise the need to identijj; clearly this service and determine the producing potentialagents and consumers. Far this reasan, this work is beginning for implementa/ion oloperatingreserve in ancillary services. 'This document sorne ofthe power markets are presented. Those markets are USA, Argentinean,Spanish, Colombian and British markets.Therefore, several scenarios to qualify the spinning and no spinning reserve of global andinterconnected system are studied. The PJM method is incorporated in a computer program, bymean 01 it, required unit commitment risk and response risk to detennine reliability 01powersystem is obtained.A reserve scheme is proposed which to take into account the response time 01units and to c!assifyin primary, secondary, and tertiary reserve.

Downloads

Download data is not yet available.

References

Alba 1996. Alba Juan J. And Gómez San Román Tomás. The example of Argentina and a proposal for California Pricing of ancillary services: Colloquium in lhe Institution of Electrical Engineers. An International perspective. London 1996.

Billinton, Roy and Rona JdAllan. Reliability Evaluation of Power Systems. Plenum Press, 1984.

Eríc Hirst and Brendan Kirby. Technical and Market Issues for operating reserves. Noviembre 1998.

NYISO. New York Independent system Operator. Ancillary Services Manual.Julio 1999.

Prada, José Fernando. Los servicios complementarios y la confiabilidad del suministro eléctrico-Un enfoque reguIatorío y de Mercado. Seminario Internacional sobre análisis y mercados Energéticos. 1998.

Prada, José Fernando. The value of reliability in Power Systemas Pricing Operating Reserves. Massachusetts Institute of Technology, Junio 1999.

Rojas, José Gabriel. Villamizar, Luis Alberto. Metodología para la evaluación de reserva operativa en sistemas de potencia. Proyecto de Grado. Universidad Industrial de Santander. 2000.

Soler, David. Modelo remuneratorío de los servicios complementarios en un Mercado eléctrico. Las reservas de potencia activa. UPCO, 2000.