Vol. 17 No. 2 (2018): Revista UIS Ingenierías
Articles

Model for flood control using two reservoirs in parallel

Rafael Fragozo
XM S.A. E.S.P. – Filial de ISA
Víctor Bedoya
XM S.A. E.S.P. – Filial de ISA
Jesús María López-Lezama
Universidad de Antioquia

Published 2018-06-19

Keywords

  • Flood control,
  • multipurpose reservoir,
  • la niña phenomenon

How to Cite

Fragozo, R., Bedoya, V., & López-Lezama, J. M. (2018). Model for flood control using two reservoirs in parallel. Revista UIS Ingenierías, 17(2), 87–94. https://doi.org/10.18273/revuin.v17n2-2018008

Abstract

 

This article presents a mathematical model to simulate the behavior of two reservoirs in parallel as primary infrastructure for flood control using the concept of Multipurpose Reservoir. The model is made up of a set of equations that represent the inflows and outflows of reservoirs and constraints associated with flood control. Model validation is performed using the technical parameters of two reservoirs of the Colombian Electric System. With this development, new decision-oriented tools are offered to the electricity market related to flood prevention and control.

 

Downloads

Download data is not yet available.

References

H. Du y Z. Zhang, «Longyangxia and Liujiaxia Reservoirs Ecology Flood Compensation Benefits», IEEE 2012 World Autom. Congr., pp. 1-5, 2012.

L. Guohua, W. Guoli, y X. Shufeng, «A Multi-reservoir Flood Operating System Based on Fuzzy Messages», 2009 Sixth Int. Conf. Fuzzy Syst. Knowl. Discov., pp. 22-28, 2009.

X. Dong, J. Liu, Y. Li, H. Bo, y X. Deng, «Dynamic Application and Risk Analysis of Flood Control Water Level to the Three Gorges Reservoir by Utilizing Mid-Term Inflow Forecasts», Power Energy Eng. Conf. (APPEEC), 2010 Asia-Pacific, pp. 1-5, 2010

R. Beilfuss, «Modelling trade-offs between hydropower generation and environmental flow scenarios: a case study of the Lower Zambezi River Basin, Mozambique», Int. J. River Basin Manag., vol. 8, n.o 3-4, pp. 331-347, 2010.

D. Goutx, P. Mériaux, y R. Tourment, «Éléments de conception hydraulique des déversoirs des endiguements de protection contre les inondations», Ingénieries, vol. Spécial 20, pp. 169-178, 2005.

L. Le Ngo, «Optimising reservoir operation. A case study of the Hoa Binh reservoir, Vietnam», Technical University of Denmark, 2006.

T. Asfaw, K. Yusof, y A. Hashim, «Parameters Estimation and Rule Curve Development of Cascade Hydropower Reservoirs», Natl. Postgrad. Conf. (NPC), 2011, 2011.

C. Fortier, A. Assani, M. Mesfioui, y A. Roy, «Comparison of The Interannual And Interdecadal Variability of Heavy Flood Characteristics Upstream And Downstream From Dams In Inversed Hydrologic Regime : Case Study Of Matawin River (Québec, Canada)», River Res. Appl., vol. 27, n.o 10, pp. 1277-1289, 2011.

J. W. Labadie, «Reservoir System Optimization Models», Water Resour. Updat., vol. 108, pp. 83-110, 1998.

V. H. Bedoya y J. López, «Optimal Flood Control with a Hydroelectric Reservoir: a Colombian Case Study», Transm. Distrib. Conf. Expo. - Lat. Am. (PES T&D-LA), 2014 IEEE PES, 2014.

S. F. Rodríguez-Corso, “Simulación dinámica de inundaciones asumiendo un estado crítico de máxima escorrentía, bajo cinco periodos de retorno, en la Quebrada la Virgen del Municipio de San José de Miranda-Santander,” Rev. UIS Ing., vol. 17, no. 1, pp. 251-270, 2018. DOI: https://doi.org/10.18273/revuin.v17n1-2018025

D. M. Rey-Valencia, J. del C. Zambrano- Nájera, “Estudio de la respuesa hidrológica en la cuenca urbana de montaña San Luis-Palogrande,” Rev. UIS Ing., vol. 17, no. 1, pp. 115-126, 2018. Doi: https://doi.org/10.18273/revuin.v17n1-2018011

J. C. García-Arredondo, J. M. Ramírez-Scarpetta, “Concepción de un simulador para el entrenamiento de operadores de centrales hidroeléctricas y desarrollo del arranque de un generador,” Rev. UIS Ing., vol. 16, no. 2, pp. 105-118, 2017. Doi: https://doi.org/10.18273/revuin.v16n2-2017010

Organización Panamericana de la Salud, «El fenómeno de La Niña hizo estragos en Colombia», Disasters: Preparedness and Mitigation in the Americas, pp. 6-7, 2011.

Economía y Negocios El Tiempo, «El 30,4 % de los embalses del país está al tope, según firma XM», 15 de mayo 2017, 2017. [En línea]. Disponible en: http://www.eltiempo.com/economia/sectores/embalses-en-colombia-estan-llenos-por-temporada-de-lluvias-88476.

XM S.A. E.S.P., XM S.A. E.S.P., «Informe de Oferta y Generación: mayo de 2017», Informe de Oferta y Generación: mayo de 2017, 2017. [En línea]. Disponible en: http://www.xm.com.co/Paginas/Informes.aspx.

D. Raje and P. P. Mujumdar, “Reservoir performance under uncertainty in hydrologic impacts of climate change,” Adv. Water Resour., vol. 33, no. 3, pp. 312–326, Mar. 2010.

M. Minville, F. Brissette, y R. Leconte, «Impacts and uncertainty of climate change on water resource management of the Peribonka River system (Canada)», J. water Resour. Plan. Manag., vol. 136, n.o 3, pp. 376–385, 2010.

L. Guohua, W. Guoli, y X. Shufeng, «A Multi-reservoir Flood Operating System Based on Fuzzy Messages», 2009 Sixth Int. Conf. Fuzzy Syst. Knowl. Discov., pp. 22-28, 2009.

XM S.A. E.S.P., “Parámetros embalses del SIN,” Parámetros técnicos del SIN, 2017. [En línea]. Disponible en : http://www.xm.com.co.

IBM-ILOGIC, «IBM ILOG CPLEX Optimization Studio», IBM ILOG CPLEX Optimization Studio, 2017. [En línea]. Disponible en: https://www.ibm.com/es-es/marketplace/ibm-ilog-cplex.